午夜小片|一级电影中文字幕|国产三级一区|精品久久久久久久国产性色av,国产一级黄色网,久久久久久久久久福利,久草超碰

Latest News

Tainted water swells at Japan nuke plant

(Agencies)
Updated: 2011-06-19 19:26
Large Medium Small

TOKYO?- The operator of Japan's crippled Fukushima Dai-ichi nuclear plant is preparing to open a door of a reactor building to allow workers to install a cooling system and equipment to prevent an explosion.

Tokyo Electric Power Co. says radiation that will be released by ventilating the Unit 2 reactor Sunday will be too small to threaten human health.

Meanwhile, more radioactive water is pooling at the tsunami-hit nuclear plant as workers scramble to restart a key cleanup system. It was shut down Saturday, hours after beginning full operations, because a component reached its radioactivity limit faster than expected.

Contaminated water could overflow within two weeks if action is not taken. At one location, water is 14 centimeters (5.6 inches) from spilling.

分享按鈕