午夜小片|一级电影中文字幕|国产三级一区|精品久久久久久久国产性色av,国产一级黄色网,久久久久久久久久福利,久草超碰

 
Home> Business

Qingdao subway Line 2 to be constructed

Updated: 2010-12-29

  Print Mail Large Medium  Small 0

Qingdao subway Line 2 to be constructed

The construction of Qingdao’s subway Line 2 is set to begin in 2012 after its feasibility study report was recently approved by 19 experts nationwide.

According to experts, on its completion in 2016, Line 2 will effectively relieve pressure on the city’s traffic, as well as being of obvious environmental benefits.

The line’s total length will be 29.7 kilometers with 27 stops. It is designed to pass through four districts and will share two stops with Line 3.

At present, preparatory work for construction of the line has been launched.

By Hao Nan and Natalie Thomas