午夜小片|一级电影中文字幕|国产三级一区|精品久久久久久久国产性色av,国产一级黄色网,久久久久久久久久福利,久草超碰

 
 

Home/Our Business/Equipment Installation

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Updated: 2014-04-01

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project

 

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.